A temporary construction site needs more than a single router in the site office. The short answer is this: a Site Connect setup brings the internet in over a mix of 4G, 5G, satellite and, where it is available, a fixed line. Those connections are load-balanced, so if one slows or drops, traffic moves to the others automatically. Managed wireless access points then carry that connection into the cabins and, where needed, across the wider site.
That approach is especially useful on large warehouse and logistics builds, with wide compounds, metal cabins and many people online at once.
Why do construction sites need a temporary setup?
Most sites do not start with a working fibre line. Even when fibre is ordered early, lead times can stretch for months. In the meantime, the team still needs email, SaaS tools, Microsoft Teams and large drawings.
Metal cabins, concrete, cranes and moving plant all affect signal and line of sight, and layouts change as the build develops. A single mobile network, or a basic router, can look fine on day one and then struggle as soon as coverage dips or more people come on site.
A temporary setup is designed for that period: connectivity from the first day, without a long-term contract, and the flexibility to grow, reduce or relocate the network as the work moves on.
How does a temporary setup combine 4G, 5G, satellite and a fixed line?
The internet path into the site is built from more than one source. Fli-Fi’s Site Connect service can use 4G, 5G, satellite and fibre, and it combines multiple WAN connections with intelligent load balancing.
In practice, that usually means:
- 4G and 5G, often across more than one mobile network, to make use of whatever coverage is available at the compound.
- Satellite, including low Earth orbit (LEO) satellite, when mobile coverage is weak, the site is rural, or extra capacity and resilience are needed.
- A fixed line or fibre, when one is already on site or arrives later in the programme. The same hardware can be used when the site switches over.
The connections are load-balanced, so if one carrier slows or drops, traffic is re-routed automatically. The aim is to avoid a single point of failure in the path to the internet. That is why this works where a single SIM in a consumer router often would not.
On a large welfare village in Erith, mobile coverage alone was not enough, so multiple mobile connections were combined with multiple satellite links, and the same hardware later switched over to fibre. Commercial-grade hardware is chosen for each site, which may include external antennas, a roof-mounted 5G connection or a satellite terminal.
How does cabin and site-wide WiFi actually work?
A strong connection into the compound is only half the job. People still need to use it in the cabins and, often, around the site.
Metal cabins are particularly poor for wireless. A signal that is fine in one cabin will often fail in the next, so the usual approach is a managed wireless access point in each cabin, linked by cabling (typically Cat6) back to a central internet hub.
Access points can also be placed for site-wide coverage, along welfare routes, across a larger compound, or with a point-to-point link where a remote location needs to be tied in. On one energy-from-waste site, a point-to-point system carried the network out to a remote security location.
Where the client needs it, staff and sub-contractors can be given separate, isolated networks, so the main team’s systems stay apart from visiting trades. Printers and other site devices can sit on the same network, and the setup can be integrated with an existing business VPN where that is required.
How is a Site Connect install put in place?
A typical install follows a clear sequence.
- Tell us about the site. Start with the site address, cabin layout and programme dates, plus how many people will be online and what they need to do.
- Survey and design. Fli-Fi carries out pre-installation consultancy and, where needed, a site survey, to decide the connections, access points and cabin cabling.
- RAMS and induction. Hardware is pre-staged before it goes to site. RAMS are signed off, and the engineers complete the site induction and attend in the required PPE.
- Install, test and handover. Experienced construction site engineers install the kit, run a full end-to-end test and sign the system off with you.
- Monitor and support for the hire. Fli-Fi’s UK-based team remotely monitors uptime, performance and bandwidth, with alerts if something goes offline. Telephone and email support is included in the hire.
Timing depends on the site. Pre-configured equipment can take a site from no internet to fully connected in hours where required, and Fli-Fi can deliver and commission next day in emergencies. A straightforward cabin setup may be completed in a day; larger sites are planned in phases. There are no long-term contractual ties, so you can hire the service for a day, a week, a month or longer.
A worked example: Kanadevia Inova in Loughborough
When Kanadevia Inova (KVI) moved from fully serviced offices into 14 cabins on a Loughborough construction compound, there was no fixed line. They needed reliable connectivity for up to 100 users over five months, for online meetings, email and SaaS tools, plus two isolated networks: one for their own team and one for sub-contractors.
A single 4G or 5G connection was unlikely to give enough throughput for that many people working in the cloud. Fli-Fi combined 4G, 5G and satellite for the path into the site, and installed 14 managed wireless access points, one in each cabin, cabled back to the main hub.
The kit was pre-staged. A site-inducted engineer completed the install under RAMS, with full testing before handover. The system was implemented and tested a week before the office move, so on day one all 100 users could work as usual in the temporary cabins.
Frequently asked questions
What if there is no fibre or fixed line on site?
4G, 5G and satellite can provide the path to the internet, load-balanced for resilience. If a fixed line is already available, or arrives later, it can be added and the site can switch over using the same hardware.
Can staff and sub-contractors be on separate networks?
Yes. Isolated networks can keep your own team and visiting sub-contractors on separate access, as they did on the Kanadevia Inova cabin compound.
How quickly can a temporary setup be installed?
It depends on the site. Hardware is pre-configured to keep time on site short. Fli-Fi can deliver and commission next day in emergencies, and pre-configured units can have a site fully connected in hours where that is required. As at Loughborough, the system can also be tested a week before people move in.
What happens when fibre finally arrives?
The temporary connections keep the site working until fibre is ready, and the same hardware can be used on switchover.
Can the network change as the site grows or moves?
Yes. The service can be reconfigured as the site evolves, including growing or reducing coverage, or relocating during the project. There are no long-term contractual tie-ins.
What do you need from us to provide a quote?
Send Fli-Fi the site address, cabin layout and programme dates, plus a note on user numbers and whether sub-contractors need their own network. The team will survey the requirement and quote a Site Connect install.
Get a Site Connect quote for your site
If you are bringing a compound online, or waiting on fibre and need the cabins and site working in the meantime, send us the site address, cabin layout and programme dates and we will survey and quote a Site Connect install. Call 020 3778 0454, or email enquiries@fli-fi.com.