Fli Fi

our work

Case Studies

Indeed Flex

We were contacted by a multi-national recruitment specialist who were looking to carry out refurbishment works in their London Farringdon office.

View Case Study »

Cancer Research UK

A repeat client, Cancer Research UK (CRUK) holds a charity version of Strictly Come Dancing where the famous York Hall venue in Bethnal Green gets decked out with glitter balls and dance floors for one incredible night.

View Case Study »

LRES

A recently built power station needed to enter a shutdown phase after commissioning prior to going live. During this shutdown phase all operations and staff have to relocate onsite to temporary cabins within the grounds. The requirement was to provide internet connectivity for a four week period to nine separate cabins with up to 40 staff spread out across them.

View Case Study »

Capitolis

Our client Capitolis are a global financial technology firm, who are heavily dependent on internet access and needed more office space to continue their growth without hindrance. Although they relocated their office within the same building their new workspace was without fibre connectivity.

View Case Study »

Pandora

Our client was creating a one-of-a-kind pop-up store for Pandora in the run up to Christmas, hosted on the Potters Fields Park beside Tower Bridge for a two-week period.

View Case Study »

Swallowfield Show

The Swallowfield Show has been running since 1885 and in these more modern times it had fallen to the organisers to provide some kind of internet connectivity for the traders, ticket readers at entrances and production team at the event.

View Case Study »

Mulberry x Axel Arigato

With the launch of a collaboration between Mulberry and Axel Arigato taking place with a star studded line up of talented musicians, DJs and rappers in an underground car park in the centre of London, the need was for our client JBP’s production team, green room and guests to have internet access in an area with none.

View Case Study »
Hitachi Zosen Inova build large Energy Recycling Facilities

HZI

Hitachi Zosen Inova build large Energy Recycling Facilities for their clients and these construction sites are large compounds with a vast array of sub-contractors moving through the build phases.

View Case Study »

Essex Army Cadet Force

Essex Army Cadet Force required connectivity for 50 PCs in order to run an IT training and online safety course.

A core component of their planned training camp weekend, accessing the internet was a key requirement for the successful completion of the course.

View Case Study »

Mission Media

The exclusive Veuve Clicquot Widow Series event attracts 300 visitors, twice daily, all of whom would potentially buy champagne. Fli-Fi was contracted to deliver connectivity in a concrete building, three levels underground.

View Case Study »
Temporary WiFi at HZI

Hitachi Zosen Inova

When HZI moved from fully serviced offices to a complex of cabins located within a compound, without a fixed line, they called on Fli-Fi. The resulting connectivity solution needed to support 100 users working across 14 cabins.

View Case Study »

Vungle

An online business, Vungle needed a temporary solution when their
fixed line installation at their new offices was delayed. They required high quality connectivity to ensure the 50-person office located in Farringdon was fully operational for their relocation date.

View Case Study »

Thank you for your enquiry, we’ll be in touch shortly.